Introducing STEVE General Contractor

Who We Are
Committed to Excellence
STEVE General Contractor is a leading and reputable Construction Company serving the Western New York area. We’ve taken a comprehensive approach to project management, and on-site productivity.

Our Background
Founded[1973] by Steve Vasciannie Sr. (1922 - 2004)
At STEVE General Contractor, we take great pride in our excellent workmanship and the ability to deliver outstanding results. Since our founding, we’ve worked hard toward building and maintaining a stellar reputation as a leading Construction Company. We provide owners with a wide range of services to cover all their needs.

Meet the Team

David Vasciannie
Chief Executive Officer, President
Since 1983
William Vasciannie
General Superintendent
Since 1977


Charles Vasciannie
Retired 2021
Since 1978
Richard Vasciannie
Retired 2020
41Â years


Steve Vasciannie Jr.
Retired 2016
45 years
Tracy McVicker
Office Manager/Project Manager
Since 2001


Ann Gattie
Administrative Assistant/Clerk
Since 2007
Kirk Thomas
Courier, etc.
.


General Foremen
Greg Thomas
Tim Thomas
Sharif Vasciannie
Guy Lowery
Garrett Northup
John Bater
​
Variety of experience
Project Managers
Charles Brown
.

Projects
Examples of Our Work

FREDERICK DOUGLASS -Â
GREATER ROCHESTER INTERNATIONAL AIRPORT
2019
Extensive upgrades throughout the Terminal
​
See linked article in previous "OUR BACKROUND" section
​
​

RCSD - #22 (6) Modernization
6/2018 - 12/2019
2 Additions (North and South); Complete interior renovations;Â Site Improvements - including parking lot, playground, sidewalks and underground drainage/grading; Full roofing replacement

RCSD - EAST HIGH STADIUM GRANDSTAND
c.2000s
Elaborate structure of concrete, brick and metals; inclusive of a Press Box and bleachers

RCSD - EDISON TECH Modernisation
2019 - 2020
Renovations and replacements of Driveways, parking and walks; Roofing; Windows and Exterior Doors; Repainting of entire building exterior; concrete retaining walls repairs

YORK CSDÂ Â BUILDING ADDITIONS
2000 - 2001
SE - New TECH/SHOP building, 3 story addition and Press Box
[N - 2nd Floor classrooms add-on; Music Dept. addition]
​
{Steve Jr., Richard, William, Charles, David, 2 Sisters, Mother and Tracy(and her sisters) are all graduates of YCSD}

GENESEOÂ CSD Athletic Wing Addition
2024
Auxiliary Gymnasium, work-out and instructional spaces: exterior access upgrades

R.I.T. Entrance Sign and surrounding structures
c.2000s
Futuristic build of concrete, brick and metal panels cladding

FREDERICK DOUGLASS -Â
G.R.I.A. Roadway Signs
1991 [Steve Sr.]
Roadway directional signs (overhead & roadside)Â entering and exiting the Rochester Airport Terminal complex (concrete bases, painted steel structures and signage)

GENESEE COUNTY BUILDING and adjacent OLD COURTHOUSEÂ Renovations
1998-1999
Addition (elevator, stairwell and corridors); entire interiors renovations and main entrances stairs replacements

GREECE ATHENA AUDITORIUM
2016
Total rehab, including seating heights adjustments in the balcony and lower level

MUMFORD Fire Department
c.2000s
Building Additions

MONROE COMMUNITY HOSPITAL Windows Replacements
1988
Windows replacements of entire building (w/AJAY GLASS)

RCSD - EAST HIGH SCHOOLÂ Windows & Exterior Doors Replacements
2014
Removals and Temporary Protection of entire building.

ICE RINK and LODGES @ Martin Luther King Jr ParkPARK
2000s
Concrete pool basin/edge, surrounding walks and Lodge renovation

NYS THRUWAY RESTSTOPS
​
2023
Drywall, Acoustical

GCC ART GALLERY ADDITION
2010
Full addition to theatre/arts wing

BROCKPORT COLLEGE
SEYMOUR UNION BALLROOM
2022
Ballroom, adjacent toilet rooms, etc. renovations(GC, MEP)

WALGREENS Masonry
(E Henrietta)
c.2010s
Brick, block and precast

BATAVIA DOWNS Cooling Tower addition and interior upgrades
2003
Part of Grandstand, previous - exterior entrance and other interior upgrades [prior to current reconstruction for gaming]

RALPH WILSON/BILLS STADIUM
2014
Concrete, sub-base trenching and
replacement for concessions and toilet rooms underground plumbing - throughout entire stadium

RCSD - FRANKLIN HIGH
1990s thru 2020s
Sidewalks, Masonry Sign, Flagpole;Windows Replacements of entire building;Interior hallway ceilings, toilet rooms, etc.

HIGHLAND PARK SIGNS
2003
{1 OF 6} @ various park entrances

ELBA CSD - Exterior Entrance Replacements
2011
Concrete stairs, ramps, walks and faux brick patterned walls; brick veneer and metal railings

CHURCHVILLE-CHILI ES
2017
New handicap ramp, stairs and walks - inclusive of new windows(entire building), elevator, offices, classrooms and gymnasium renovations project

911-EMERGENCY COMMUNICATIONS FACILITY
2016
Upgrades to Primary and Secondary Operations, offices, foyer, lobby, etc.

The Insurance Center (Batavia,NY)
MASONRY FACADE
2010s
Exterior brick and stone.....

GATES-CHILI HS Aquariums
2014
New intricate solid concrete structure, w/ceramic tiles (replaced deteriorating metal stud and MR drywall)

Hilton, NY Community Center
1997
Elevator and machine room addition and handicap ramp matching existing building

PAVILION CSD
2016
2 stories windows replacements of the original building. Previous exterior grade changes to expose (renovated)Cafeteria windows @ basement level. New sidewalk and railings @ tunnel under Rt. 63

PAVILION CSD New Corridor Addition
2018
Connecting corridor from main building to renovated Shops;Â including Main Offices and Toilet Rooms renovations

LAKE RILEY LODGE @ Cobbs Hill Park
c.1990s
Renovations prior to former Rochester Mayor Bill Johnsons' inauguration dinner

Pembroke Town/Corfu Village Court
2002
New courtroom; new entrances

GREECE OLYMPIA {ARCADIA} HIGH SCHOOL
2014 [2013]
Window replacements - entire building {50%@ARCADIA]
[Classrooms, offices, hallways - total gut and renovate]

MCC Main Entrance ELEVATOR
c.1990s
Created new elevator at previous stacked office space. Part of handicap accessible toilet rooms and lecture halls project

AVON CSD Pool Building
2015
Total removals and rebuild of the pool, deck, bleachers; including "raising the roof". [New Concession Stand built into west side of existing building]

BUCKMAN-Brighton-PARK
c.2000s
Concession Stand/Toilet Facility

GENESEO Water Filtration Plant @ Conesus Lake (NW)
c.1980s
Stone face block and brick {Steve Sr.}

CANALSIDE - Buffalo
2013
Installed wood decking @ the pedestrian bridges; delivered/staged granite from offsite storage (installed throughout by others)

RCSD Franklin High Stadium
c.1990s
Turf, synthetic track, bleachers, press box

BATAVIA DOWNS Food Services
2019
3 additions along the racetrack

BRIGHTON CSD
2021
HS Main Sign
Inclusive of extensive interior renovations of the HS and MS

BRIGHTON HS AUDITORIUM
2021
Updated original Auditorium

Jefferson Ave. Seventh Day Adventist Church [Steve Sr.] (Â Demolished 2022 following fire)
c.1980s
(N) Addition/stairs/ramp; Classrooms, Sanctuary renovations

SUNY GENESEO Entrance Signs
c.2000s
Inclusive of many projects on campus for 40+ years

RCSD FRANKLIN HIGH AUDITORIUM
2009
Total renovation

WHEATLAND CHILI CSD
c.2000s
Transportation Building Additions (N&W)

Windows Replacements @ V.A. Hospital in Canandaigua, NY
c.1980s
Remove and replace 3 buildings

NYS VETERANS HOME - Batavia, NY
2004; 2005
4 Bedroom Additions N,S,E&W
2 Dining Room Additions S,E&W
[prior to recent exterior facelift]

VA HOSPITAL Elevator - Batavia, NY
c.1990s
Elevator addition/Handicap entrance

LODGE @ Martin Luther King Jr. Memorial Park
c.2000s
Subterranean facility recreated from abandonded exposed concrete areas

MCWA Pump Houses
c.1990s
Chili (and Scottsville), NY

RCSD TRANSPORTATION (Hudson Avenue
c.2000s
New -Â Vehicle Maintenance Building

GENESEO Wastewater Treatment Plant
2003
New Inlet/Digester Building

RCSD FRANKLIN HIGH
c.2010s
Loading Dock Addition w/elevator

KENDALL CSD
2020
Field Toilet Facility. Inclusive of CIP renovations of the HS and ES

RCSD #39
2022
New brick walls, concrete sidewalks and handicap ramp, granite and precast steps and entrance landing, railings. Inclusive of interior doors replacements; Gymnatorium renovations

GREECE(NY) ARCADIA Auditorium
2015
Total renovations

WARSAW CSD Administration Building
2020
Exterior upgrades and created new offices, etc. from abandonded shop. Inclusive of a 2 year CIP renovations @ the HS and ES

VA HOSPITAL(Batavia, NY) Loading Dock
c.1980s
Addition [Steve Sr.]

MT. MORRIS(,NY) Wastewater Treatment
Plant
c.2010s
New building and 1 small addition

BATAVIA(,NY) Water Treatment Plant
c.2000s
Exterior masonry restorations; Interior masonry and concrete repairs

PENN YANN(,NY) WWTP
2016
2 New storage buildings on existing foundations, new concrete floor slabs

SUNY BROCKPORT - 4 High rise Dormitories
c.2000s
Windows replacements [assisted Flower City Glass] - PREVIOUS YEARS PROJECTS: Elevator modifications - created new doors to allow 2(3) elevators to stop at each floor{previously alternating}(c.1990s); Dryer vents; Fire alarm upgrades(c.1990s)[Steve Sr.]; Toilet Rooms renovations throughout entire campus(2006); SUBWAY @ Student Union; etc.

BROCKPORT(,NY) MIDDLE SCHOOL
c.2010s; 2000s
Auditorium interior upgrades;
Exterior masonry restorations - brick, steel lintels(w/brick) replacements

cds housing @ Joseph Ave./Clifford Ave./Maria St.
2022
Doors, millwork-cabinets, counters, trims

MCC DORMS - Interiors
c.2000s
Installed doors; cabinetry, trims

SUNY BROCKPORT Eagle Hall Dorms - INTERIOR
2018
Doors, frames & hardware; cabinets;Â solid surface sinks, countertops, window sills

AVON(,NY) WESLEYAN CHURCH Addition SE
c.1970s
Large 1st floor and basement addition [Steve Sr. prior to incorporation]